Scope:
A full refurbishment in a staged manner, ensuring it remained fully operational throughout. Post-completion, the CEO praised it as “the best airport facility in Australian mining.”
Value: $900k
Timeline: May 2024 – Aug 2024
Scope:
This project was successfully rescued from a distressed position where minimal progress had been made by the previous builder, leaving the owner in a critical situation.
Value: $8M (approx)
Timeline: Feb 2024 – Jan 2025
Scope:
We renovated the main commercial kitchen to meet current hygiene codes. The project was staged to ensure the kitchen remained fully operational throughout construction.
Value: $1.5M
Timeline: May 2023 – Jul 2023
Scope:
We addressed mould-affected walls by removing and reinstating them, replacing shower base silicon, deep cleaning each room, and repainting 70% of wall surfaces.
Value: $7.2M
Timeline: Aug 2022 – 2024
Scope:
Design and Construction of industrial workshop, service pit and office. Across a 22,000m2 site this project has been developed to service an incoming tenant on a 5-year lease.
Value: $9m Forecast
Timeline: Mar 24 - Dec 24
Scope:
To install a new Permit Facility, a new Tool Storage facility and Improvements to the existing facilities.
The Project includes Bulk Earthworks, preparation for building pads and bus bay relocations, in ground Electrical and Fibre Services, Electrical installations, Mechanical installations, new Patios, Concrete Slabs, and the de complexing / relocation / complexing of the Permit Hut Buildings.
Value: $1m approx.
Timeline: May 2025 -Jul 2025
Scope:
Involves the remediation to the internal fabric and a realignment of the front of house food and associated lounge and seating areas.
The overall works to both Dining Halls consist of replacing the flooring substructure, a refresh of the internal areas, including new cabinetry, furniture, and servery equipment throughout, as well as new furniture and equipment, along with mechanical and electrical upgrades throughout. All works are undertaken whilst maintaining the operational capability, functionality, and serviceability. We have transitioned in excess of 40 individuals through the BHP and Compass medical and induction process.
Value: $6m approx.
Timeline: Mar 2025 - Dec 2025
Scope:
To provide HVAC maintenance for the existing mechanical services at the Roy Hill mine camp. We produced a Maintenance Plan detailing scheduled monthly checks for the Air-Conditioning, Refrigeration, Ventilation & Mechanical Services with all works being completed as per the relevant standards and codes.
Our approach follows a tested criteria of checks and preventative measures with prompt reporting and asset management to ensure the longevity of all the equipment we service.
Value: $300k
Timeline: Sept 2024 for a 12-month period